Develop a Work Breakdown Structure for a Highway Resurfacing
& Improvement of State Roads and Highways

Answers

Answer 1

Work Breakdown Structure (WBS) is a hierarchical decomposition of a project into smaller, more manageable components. It helps in organizing and planning the project activities.

In the case of highway resurfacing and improvement of state roads and highways, the WBS can be developed as follows:The Work Breakdown Structure (WBS) for the Highway Resurfacing and Improvement project can be divided into the following major components:To further break down the main components, each major component can be divided into smaller tasks and sub-tasks. For example, under the Construction Phase, tasks such as site preparation and clearing can include activities like removing obstacles, clearing vegetation,and leveling the ground.

Similarly, under the Design Phase, preparing road layout and alignment designs can involve activities like conducting surveys, analyzing traffic patterns, and developing alternative designs.the Work Breakdown Structure can continue to be broken down into more detailed levels based on the specific requirements and complexity of the project. It is essential to ensure that each task and sub-task is clearly defined, has a specific deliverable, and can be assigned to a responsible party.

To know more about decomposition visit:-

https://brainly.com/question/12974523
#SPJ11


Related Questions

In a Beam-and-Girder system, how are the steel members finished?

Answers

In a Beam-and-Girder system, the steel members are finished through a process called painting or coating, which provides protection against corrosion and enhances the steel's appearance.

The finishing process of steel members in a Beam-and-Girder system involves several steps:
1. Surface preparation: Before painting or coating, the steel members' surfaces are cleaned and prepared to remove any contaminants, such as rust, dirt, or grease. This can be done through methods like sandblasting or power tool cleaning.
2. Primer application: After surface preparation, a primer is applied to the steel members. The primer acts as a base layer that improves the adhesion of the paint or coating and enhances its protective properties.
3. Intermediate coat (optional): In some cases, an intermediate coat may be applied to provide additional protection, such as resistance to corrosion or abrasion.
4. Finish coat: The final step in the process is the application of the finish coat, which gives the steel members their desired appearance and provides an additional layer of protection. The finish coat can be of various types, such as epoxy, polyurethane, or acrylic.

The finishing of steel members in a Beam-and-Girder system is essential for protection against environmental factors and maintaining their structural integrity. The process involves surface preparation, primer application, and the application of a finish coat, which may also include an intermediate coat for added protection.

To know more about Beam-and-Girder visit:

https://brainly.com/question/29415893

#SPJ11

In a Beam-and-Girder system, steel members are finished using a process that involves cleaning, priming, and painting or applying a protective coating.

The first step in finishing steel members in a Beam-and-Girder system is cleaning them to remove any dirt, rust, or contaminants. This can be done using methods such as sandblasting, power brushing, or solvent cleaning.

After cleaning, a primer is applied to the steel members to provide a base for paint or protective coatings. This primer helps to prevent corrosion and improve adhesion of the final finish. The last step is applying a paint or protective coating, such as epoxy or zinc-based coatings, which protect the steel from environmental factors and increase its durability.The finishing process for steel members in a Beam-and-Girder system is essential for protection against corrosion and increasing the overall longevity of the structure. It involves cleaning, priming, and applying a protective coating or paint.

To know more about Beam-and-Girder visit:

https://brainly.com/question/29415893

#SPJ11

Kevin fixes trucks as a job. The engine is oily. Which set set of equipment should Kevin use to fix the truck?

Answers

Answer:

A hammer and a wrench

Explanation:

Tech A says that open loop is when the PCM pretty much ignores the oxygen sensor signals. Tech B says that closed loop is when the PCM shuts off the fuel injectors during a collision. Who is correct

Answers

Answer:

Tech A

Explanation:

3. Assertive communication means:
A. Confidently and directly communicating what you think and feel, without being aggressive
or passive
B.O Confidently saying what you think and feel, even If It means overshadowing someone
else's feelings
C.O Saying what you think and feel only If and when the other party gives you permission to
do so
D. None of the above

Answers

Answer:

A. Confidently and directly communicating what you think and feel, without being aggressive or passive.

Explanation:

Assertive communication is the ability to express both positive and negative ideas in a way that it is a honest and direct message. It doesn't mean to say things to the other person with the intent of causing harm or making them feel better, it's just saying things as they are.

Merchandise without an expiration date like electronics, tools and home goods typically have a longer

Answers

Answer:

Shelf life.

Explanation:

In Business, an inventory is a term used to describe a list of finished goods, goods still in the production line and raw materials that would be used for the manufacturing of more goods in a bid to meet the unending consumer demands.

Simply stated, an inventory can be classified into three (3) main categories; finished goods, work in progress, and raw materials.

An inventory is recorded as a current asset on the balance sheet because it's primarily the most important source of revenue for a business entity.

Also, the three (3) main cost concept associated with an inventory are;

1. First In First Out (FIFO).

2. Last In First Out (LIFO).

3. Weighted average cost.

Shelf life can be defined as a measure of the length of time that a particular product could be kept or stored without it getting bad or becoming unsuitable for use by the consumers. Thus, the shelf life of a product is largely dependent on its expiration date.

Hence, merchandise without an expiration date like electronics, tools and home goods typically have a longer shelf life.

an engineer is tasked with measuring the height of a wall using a millimeter ruler. the engineer realizes that the height fluctuates by several centimeters at different positions along its length. how should the engineer make the measurement?.

Answers

The height specific of the wall should be measured numerous times throughout its length by the engineer, who should average the results.

A wall's height may vary by several centimeters at various spots along its length, making it challenging to measure with a millimeter ruler. The engineer should measure the wall numerous times along its length and average the data to assure accuracy. The height of the wall should be measured numerous times throughout its length by the engineer, who should average the results. This will provide a more accurate measurement of the wall's height while taking any variations into consideration. In order to obtain the most precise reading, the engineer should measure the wall at spots that are spaced as evenly as possible. The most precise result is obtained by taking several measurements and averaging them.

Learn more about specific here-

brainly.com/question/19819958

#SPJ4

An oil pump operating at steady state delivers oil at a rate of 10 lb/s through a 1-in.-diameter exit pipe. The oil, which can be modeled as incompressible, has a density of 55 lb/ft^3 and experiences a pressure rise from inlet to exit of 40 lb-/in^2. There is no significant elevation difference between inlet and exit, and the inlet kinetic energy is negligible. Heat transfer between the pump and its surroundings is negligible, and there is no significant change in temperature as the oil passes through the pump.
Determine the velocity of the oil at the exit of the pump, in ft/s, and the power required for the pump, in hp.

Answers

Answer:

30 lbs

Explanation:

Answer:

The answer above is correct.  30lbs

Explanation:

Consider the table: a) Build a decision tree for the training set given above. It's urgent help plz

Consider the table: a) Build a decision tree for the training set given above. It's urgent help plz

Answers

Explanation:

umm can you explain me what i have to answer

Describe the process of sowing of maize by a seed drill.

Answers

Answer:

Find explanation below.

Explanation:

Seed drills make it possible for seeds to be planted at equal spacing or distances.

The process begins with the plowing of the field. This is is done to open up the soil and enable it to easily accept the seeds. The farmer then sets the drill in a manner as to accommodate the size of the maize seeds. The maize seeds are then loaded on the hopper located above the drill. The drill can then start planting the maize seeds while giving them equal spacing and depth.  Depth of 7 to 8 cm, and spacing of 10-13 cm are recommended for optimum results.

Seed drills are important because they allow seeds to be planted at specific depths and distances. This allows for increased crop yield. They also help to curb the growth of weeds.

Design an algorithm for computing √n

for any positive integer n. Besides
assignment and comparison, your algorithm may only use the four basic
arithmetical operations.

Answers

Positive integer n design an algorithm

pjm, the regional grid operator that includes peco, has asked for consumers to look for ways to safely conserve electricity until 10 a.m. tomorrow. if your health permits, please consider reducing the use of your electricity.

Answers

PJM Interconnection, the electricity grid operator for 65 million people in 13 states and the District of Columbia, has requested the public in its region to conserve electricity.

What is grid?GRID is a user-friendly data tool for the average person in a world full of sophisticated software created for experts. Our goal is to enable contemporary knowledge teams to investigate, clarify, and work together on numbers. Spreadsheet data is made simple to understand and use by GRID, enabling your team to operate at peak efficiency and perform like the champions they are.Build stunning interactive models with your spreadsheet data, enrich your analyses with narratives, and much more. In just a few minutes, you can edit, update, and work on GRID documents with your team.  Make a new GRID document, add a spreadsheet from your computer or from a cloud drive, and then connect it. Data will be necessary for your work.

To learn more about spreadsheet refer to:

https://brainly.com/question/26919847

#SPJ4

The hazard communication standard requires employers to do all of the following except
A.) Obtain SDS for hazardous in toxic substances
B.) Train employee on how to safely use and obtain information about the hazardous substances in their workplace
C.) Label containers of hazardous
D.) prepare and post a list of employees who handle hazardous and toxic substances in the workplace

Answers

Answer:D

Explanation:

All the options given regarding the hazard communication standard are correct except option D "prepare and post a list of employees who handle hazardous and toxic substances in the workplace".

The main requirements of employers that use hazardous chemicals are:

• ensure that chemicals are properly labelled.

• provide safety data sheets.

• train employees.

• create a written hazard communication program.

It should be noted that preparing and posting a list of employees who handle hazardous and toxic substances in the workplace is incorrect.

Therefore, the correct option is D.

Read related link on:

https://brainly.com/question/17611643

An aircraft is in straight, level flight has a CL of 0.42, and a 1° increase in angle of attack would increase the CL by 0.1. Following a gust that increases the angle of attack by 3° , what load factor would the aircraft be subject to?n = 1.4n = 1.7n = 0.7n = 1.0

Answers

We need to use the equation that relates the lift coefficient (CL) to the angle of attack (AOA):

CL = CL0 + k*AOA

Where CL0 is the lift coefficient at zero angle of attack, k is the lift curve slope (which tells us how much CL changes per degree of AOA), and AOA is the angle of attack.

We know that the aircraft is in straight, level flight, which means that the lift force is equal to the weight force, and the load factor is 1. Therefore, we can use the equation for lift force:

L = 0.5*rho*V^2*S*CL

Where L is the lift force, rho is the air density, V is the airspeed, S is the wing area, and CL is the lift coefficient.

Now, let's apply the gust that increases the AOA by 3 degrees. We can calculate the new CL using the given information:

CL = CL0 + k*AOA
CL = 0.42 + 0.1*3
CL = 0.72

Therefore, the new lift force is:

L = 0.5*rho*V^2*S*CL
L = 0.5*1.225*100^2*20*0.72
L = 132120 N

The load factor is the ratio of lift force to weight force:

n = L/W
n = L/(m*g)

Assuming a weight of 20 kN (which is the weight force in straight, level flight), we can calculate the load factor:

n = 132120/(20*1000*9.81)
n = 1.35

Therefore, the aircraft would be subject to a load factor of 1.35 after the gust. This is higher than the limit load factor of 1.4, which means that the pilot would need to take action to reduce the load factor (such as reducing speed or changing the aircraft's attitude) to avoid structural damage.

For such more question on coefficient

https://brainly.com/question/1038771

#SPJ11

Refrigerant-134a is throttled from the saturated liquid state at 700 kPa to a pressure of 160 kPa. Determine the page 253temperature drop during this process and the final specific volume of the refrigerant.

Answers

Answer:

The correct solution will be "0.0344 m³/kg". The further explanation is given below.

Explanation:

The given values are:

\(P_1=700 \ Kpa\)

    \(=0.7 \ Kpa\)

From table,

\(T_1=26.69^{\circ} C\)

\(h_f=88.82 \ kJ/kg\)

\(P_2=160 \ Kpa\)

\(h_f=31.21 \ kJ/kg\)

\(T_{sat} = -15.6^{\circ}C\)

Now,

\(\Delta T=T_{in}-T{out}\)

      \(=-15.6-26.69\)

      \(=-42.29^{\circ}C\)

\(V=V_f+x(V_g-V_f)\)

   \(=V_f+\frac{h-h_f}{h_g-h_f}(V_g-V_f)\)

On putting the value, we get

  \(=(0.0007437)+(\frac{88.82-31.21}{241.11-31.21})(0.12348-0.0007437)\)

  \(=0.0344 \ m^3/Kg\)

Bi servers use ________ to determine what results to send to which users and on which schedule.

Answers

Bi servers use matadata to determine what results to send to which users and on which schedule.

Metadata, also known as data that describes other data, is organized reference material that aids in classifying and identifying characteristics of the data it describes. John W. Warren refers to metadata as "both a cosmos and DNA" in Zen and the Art of Metadata Maintenance.

In most applications of information technology, the prefix "meta" denotes "an underlying definition or description." Basic data information is summarized in metadata, which can make it simpler to locate, utilize, and reuse specific instances of data.

Simple document file metadata includes things like author, date created, date edited, and file size. Finding a given document is made considerably simpler when one has the option to search for a specific aspect (or elements) of that metadata.

To know more about metadata click here:

https://brainly.com/question/14699161

#SPJ4

40. AASHTO assumes a deceleration value in calculating SSD of:
a. 14 ft /sec2
b. 11.2 ft /sec2
c. 9.6 ft /sec2
d. 10.2 ft /sec2

Answers

AASHTO assumes a deceleration value in calculating stopping sight distance (SSD) of B. 11.2 ft/s^2. This doesn't take any road defects into account.

during a 12 volt charging systems volt meter test, all of the electrical accessories are on when checking______voltage.

Answers

During a 12-volt charging system voltmeter test, it is recommended to turn off all electrical accessories to get an accurate reading of the system's voltage.

A charging system voltmeter test is a diagnostic procedure performed to assess the voltage output of the charging system in a vehicle. The charging system is responsible for maintaining the battery's charge and providing electrical power to the vehicle's electrical components while the engine is running.

To conduct a charging system voltmeter test, a voltmeter is connected to the battery terminals or the charging system's output terminal. The engine is then started, and the voltmeter measures the voltage output of the charging system.

By turning off the electrical accessories, you can eliminate any potential load on the system, allowing you to measure the actual voltage output. This will provide a more reliable assessment of the charging system's performance.

Therefore, during a 12-volt charging system voltmeter test, it is recommended to turn off all electrical accessories to get an accurate reading of the system's voltage.

For more details regarding the charging system voltmeter test, visit:

https://brainly.com/question/969508

#SPJ4

Using the Dictionary below, create a game that picks a random number based on the length of the dictonary. Using that random number, prompts the user for the capital of that state (the key for your dictionary) - Use the code snipet below Your program must prompt the user by asking "What is the capital of XXX:" and XXX is the state name. Your program should compare the guess to the actual capital for that state. If the guess is correct, increment the number of correct guesses. If the guess is wrong, increment the numner of incorrect guesses. When the user types in quit in eithe uppercase or lowercase, the program should print out the results of the game by telling the payer you had XX correct responses and YY incorrect responses. Then the program should end.

Answers

The game prompts the user for state capitals, tracks correct and incorrect guesses, and displays the results when the user types "quit".

Create a game that prompts the user for the capital of a randomly selected state from a dictionary, tracks correct and incorrect guesses, and displays the results when the user types "quit".

import random

# Dictionary of state capitals

state_capitals = {

   "Alabama": "Montgomery",

   "Alaska": "Juneau",

   "Arizona": "Phoenix",

   # Add more states and capitals as needed

}

correct_guesses = 0

incorrect_guesses = 0

while True:

   # Pick a random state from the dictionary

   random_state = random.choice(list(state_capitals.keys()))

   # Prompt the user for the capital of the state

   user_guess = input(f"What is the capital of {random_state}: ")

   # Check if the user wants to quit

   if user_guess.lower() == "quit":

       break

   # Compare the user's guess with the actual capital

   if user_guess == state_capitals[random_state]:

       print("Correct!")

       correct_guesses += 1

   else:

       print("Incorrect!")

       incorrect_guesses += 1

# Print the game results

print(f"You had {correct_guesses} correct responses and {incorrect_guesses} incorrect responses.")

```

In this code, you can modify the `state_capitals` dictionary to include more states and their corresponding capitals. The game will randomly select a state, prompt the user for the capital, compare the guess to the actual capital, and keep track of the number of correct and incorrect guesses. The user can type "quit" at any time to end the game and see the results.

Learn more about game prompts

brainly.com/question/30411520

#SPJ11

An engine manufacturer wants to develop a gasoline engine that produces 300 hP at 6000 rpm. They can achieve 10 bar BMEP at peak power with a naturally aspirated engine, and 20bar BMEP with a turbocharged engine. Most modern light-duty engines have displacements of ~0.5L per cylinder. Determine the displacement and minimum number of cylinders (rounded to nearest whole number) required to meet these specs for: a. A naturally aspirated engine. b. A turbocharged engine.

Answers

Answer:

a). 5 cylinders

b). 3 cylinders

Explanation:

To develop a gasoline engine that produces

Power, P = 300 hp

               = 300 x 746 = 223710 watt

at speed, N = 600 rpm = 100 rps

and stroke volume \($V_s=0.5$\) L

                                   = \($0.5 \times 10^{-3}\ m^3$\)

a). A naturally aspirated engine

BMEP at peak power = 10 bar

                                    = \($10 \times 10^5\ N/m^2$\)

Suction volume, V = \($V_s \times N$\)

                           = \($0.5 \times 10^{-3} \times 100 = 0.05\ m^3/s$\)

Power produced in one engine cylinder , p = BMEP x V

                                                                        = \($10 \times 10^5 \times 0.05$\)

                                                                        = 50000 watts

No. of cylinders required, n = \($\frac{P}{p}$\)

                                              = \($\frac{223710}{50000}$\)    

                                             = 4.47

So number of cylinders ≈ 5 nos.

b). A turbo charged engine

   BMEP = 20 bar = \($20 \times 10^5\ N/m^2$\)

   and Volume V = \($0.05\ m^3 /s$\)

Power produced in one engine cylinder, p = BMEP x V

                                                                       = \($20\times 10^5 \times 0.05$\)

                                                                       = 100000 watts

Therefore, number of cylinders, n = \($\frac{P}{p}$\)

                                                        = \($\frac{223710}{100000}$\)

                                                        = 2.23

So number of cylinders ≈ 3 nos.

a commercial refrigerator with r-134a as the working fluid is used to keep the refrigerated space at -35 c by rejecting waste heat to cooling water that enters the condenser at 18 c at a rate of 0.25 kg/s and leaves at 26 c. the refrigerant enters the condenser at 1.2 mpa and 50 c and leaves at the same pressure subcooled by 6 c. if the compressor consumes 3.3 kw of power , determine (a) the mass flow rate of the refrigerant, b) the refrigerant load, c) the cop, and d) the minimum power input to the compressor for the same refrigeration load.

Answers

At 1.2mpa pressure and 50c

What is pressure?
By pressing a knife against some fruit, one can see a straightforward illustration of pressure. The surface won't be cut if you press the flat part of the knife against the fruit. The force is dispersed over a wide area (low pressure).

a)Mass flow rate of the refrigerant
Therefore h1= condenser inlet enthalpy =278.28KJ/Kg
saturation temperature at 1.2mpa is 46.29C
Therefore the temperature of the condenser

T2 = 46.29C - 5
T2 = 41.29C

Now,
d)power consumed by compressor W = 3.3KW
Q4 = QL + w = Q4
QL = mR(h1-h2)-W
= 0.0498 x (278.26 - 110.19)-3.3
=5.074KW
Hence refrigerator load is 5.74Kg

(COP)r = 238/53
(Cop) = 4.490

Therefore the above values are the (a) mass flow rate of the refrigerant, b) the refrigerant load, c) the cop, and d) the minimum power input to the compressor for the same refrigeration load.

To learn more about pressure
https://brainly.com/question/13717268
#SPJ4

PLEASE HELP I NEED THIS ASP!!

PLEASE HELP I NEED THIS ASP!!

Answers

Answer:

up up down down

Explanation:

left right left right b a select start


3. All companies, small or large, are required to have a written fire prevention plan.
A) O True
B)O False

Answers

Answer:

A) True

Explanation:

Answer:

A. true

Explanation:

cause if they dont they could possibly get sgut down for safety hazards and violations of its' employee. And there could be a asccident because there was no safety.

(c) Give examples of 3 everyday things that are quantized (for example, stairs are quantized). Examples: stairs, ladder, class rank (you can be either #1 or #2 in the class, not in between), number of family members, number of students at BYU or in this class… Ask yourself whether it makes sense for something to NOT be a whole #. If the answer is no, then that something is quantized

Answers

Quantization refers to the concept of breaking something down into discrete, whole units or levels. This occurs in many everyday things that we may not even realize. For example, time can be quantized into hours, minutes, and seconds. Another example is money, which is typically quantized into dollars and cents. Even sound can be quantized, as it is composed of discrete sound waves.

In addition to the examples given in the question, other everyday things that are quantized include the number of items in a package (such as a box of cereal or a bag of chips), the number of pages in a book, and the number of steps in a recipe. These things make sense to be quantized because they are composed of distinct, countable units. Trying to measure them in fractions or decimals would not make sense.

Overall, quantization is a fundamental concept that underlies many aspects of our everyday lives, and understanding it can help us make sense of the world around us.


Learn more about quantization : https://brainly.com/question/30113760

#SPJ11

# Structure Mechanics.
Draw the internal force (axial force, shear force and moment) diagrams of the frame.

# Structure Mechanics.Draw the internal force (axial force, shear force and moment) diagrams of the frame.

Answers

The sander is the axial force goes before the shear force

(GIVING BRAINIRLY)does anyone know what this is? is it a sliding glass door or?

(GIVING BRAINIRLY)does anyone know what this is? is it a sliding glass door or?

Answers

My guess would be a sliding door.

This is likely because the wall seems to be containing a “pocket” for the door when it is moved.

When the door is in the pocket, the wall formerly containing the door will be exposed.

This is added to let the builder/designer to know that it is not a traditional door

I don’t know what else it could be…

I hope this helps

Attentional demands are influenced by which of the following?
a) Environmental complexity
b) Skill level of the performer
c) Task complexity
d) All of the above
e) A and C only

Answers

Environmental complexity, performer skill level, and task complexity all have an impact on attentional needs. The degree of attention needed in a particular situation depends on all of these elements. The choice (d) is the right response.

All of the aforementioned factors—environmental complexity, performer skill, and task complexity—have an impact on attentional demands. Depending on the complexity of the environment, such as the existence of distractions or different stimuli, the level of attention needed in a particular circumstance can change.

The skill level of the performer also affects attentional demands, as beginners may require more focused attention compared to experts who can perform tasks more automatically. Additionally, the complexity of the task itself, including the number of components or decisions involved, can impact the attentional demands placed on an individual.

Learn more about demands here:

https://brainly.com/question/30772053

#SPJ11

Determine the voltage drop from the top terminal to the bottom terminal, vab, in the right hand branch and, vcd, in the left hand branch of the circuit. Determine each voltage drop based on the elements in the corresponding branch.

Answers

Answer:

Hello your question is incomplete attached below is the missing part of the question

answer ;

voltage drop in the Vcd branch = 30 V

Voltage drop in the middle branch = 40v - 30v = 10 volts

voltage drop in AB = 60 + ( -600 * 0.05 ) = 60 - 30 = 30 volts

Explanation:

Determine voltage drop from top terminal to bottom terminal ( Vab ) in the right hand branch and Vcd in left hand branch

40v and 50mA are in series hence;  Ix = 50mA

also Vcd = 30V

CD is parallel to AB hence; Vcd = Vab = 30 V

Vab = ∝*Ix + 60 v

 30v  = ∝ ( 50mA ) + 60

therefore ∝ = -600

voltage drop in the Vcd branch = 30 V

Voltage drop in the middle branch = 40v - 30v = 10 volts

voltage drop in AB = 60 + ( -600 * 0.05 ) = 60 - 30 = 30 volts

Determine the voltage drop from the top terminal to the bottom terminal, vab, in the right hand branch

if you are a mechanical engineer answer these questions:
1. Are communication skills (reading, writing, and speaking) necessary in this profession?

2. How are Communicative Competences integrated into this profession?

Answers

Answer:

1. Yes, they are all necessary.

2. Both written and verbal communication skills are of the utmost importance in business, especially in engineering. Communication skills boost you or your teams' performance because they provide clear information and expectations to help manage and deliver excellent work.

An AC bridge has 4 arms. In arm AB, a 120 kilo-ohm resistor and a 47 microfarads capacitor are connected in parallel while arm BC has 330 microfarads capacitor. If arm AD has a 330 kilo-ohm resistor, calculate the value of the unknown capacitor and resistor in arm CD connected in series. (AC power is supplied through A and C while the detector is connected across BD)

Answers

The unknown capacitor in arm CD must have a value of 330 microfarads, and the unknown resistor must have a value of 100 kilo-ohms.

To solve the problem, use the following formula:
Cseries = C1 x C2 / (C1 + C2)

Where C1 is the value of the capacitor in arm AB (47 microfarads) and C2 is the value of the capacitor in arm BC (330 microfarads).

Therefore, Cseries = 330 microfarads.

Also, the total resistance of arms CD is the sum of the resistance of the resistor (R) and the reciprocal of the capacitive reactance of the capacitor (1/Xc).

Using the following formula:
Rtotal = R + 1/Xc

Where Xc = 1/2πfC,

f is the frequency and C is the capacitance.

For this problem,

Xc = 1/2π(50)(330 x 10-6)

=> 100 kilo-ohm.

To learn more about Capacitor :

https://brainly.com/question/30426172

#SPJ4

Question
А
Particle of 2kg mass is being pulled across a smooth horizontal
surface by a horizontal force. The force does 24 Joule of work in
increasing
the particle's
velocity from 5m/s
to v m/s. calculate
the value of v and the position of particle
after 15s​

Answers

Answer:

udhddhdiejebdidjebdhdidh

Other Questions
When studying migration, high levels of crime, violence, and pollution areexamples ofA. forced migration,B. pull factors.c. chain migration,D. push factors. food additives considered safe are included in the as (gras) list. What was a problem faced by the early Republic of Texas? Given the function {f(x)=32-x}^{2}f(x)=32x 2 , what is f(-5)f(5)? How does this line add an element of tension to the story? (5 points) a It allows readers to feel more concern for the dogs than the humans. b It increases the fear and tension for readers and characters. c It makes events more predictable and expected than before. d It suggests the dogs are the main focus of the story. How many people died during the Pig War? What branch of the government contains Congress, which creates laws?the Legislative Branchthe Judicial Branchthe Executive Branch this is the best way for people to avoid the use and abuse of drugs During summer, when the snow melts, the water level of the Yukon River increases. If the water level of the river increased by 44 centimeters in 4 days, what is the water level increase rate in centimeters per day? what is the equation for this graph or table? picture shown :D 12. The length of a rectangle is 6 meters longer than the width. If the total area of the rectangle is 16m, find the dimensions of the rectangle. Analysis of Receivables Method At the end of the current year, Accounts Receivable has a balance of $885,000; Allowance for Doubtful Accounts has a debit balance of $8,000; and sales for the year total $3,980,000. Using the aging method, the balance of Allowance for Doubtful Accounts is estimated as $40,800. a. Determine the amount of the adjusting entry for uncollectible accounts. b. Determine the adjusted balances of Accounts Receivable, Allowance for Doubtful Accounts, and Bad Debt Expense. Accounts Receivable Allowance for Doubtful Accounts Bad Debt Expense c. Determine the net realizable value of accounts receivable. the set is a basis of the space of upper-triangular matrices. find the coordinates of with respect to this basis. what is the main difference between a parlimentary demoncracy and presidential democracy Assuming that wine is a normal good, an increase in consumer income, other things being equal, will? What is the most important cell in your body and why is it important like math What is the measure of all angles shown? After conducting a survey of all her classmates, Midge discovers that the amount of money everyone spends buying books each month has a mean of $30. What does the mean say about the amount her classmates spend on books Eli is a public defender representing his client in a first-degree murder case. Roxy, his client, does not want to make a plea, so the case is going to trial. Eli is preparing to seat the jury and wants the jurors to be able to relate to his client, who grew up poor but started her own business. If a prospective juror states that he believes all women are killers, Eli can ask that the juror be removed by requesting a what is the impact of the addition of acid to the final texture, appearance, and flavor of the cooked legumes? describe what you observed in your lab experiments